What Is a Transmittal in Construction?
By Wyatt Cooper · Published · 3 min read
Key takeaways
- A transmittal is the cover, not the content: it lists what is enclosed and why, so both sides have a dated record of what changed hands.
- Submittals are the most common thing sent under a transmittal, and many specifications name the form to use.
- Number transmittals in one sequence and keep a copy of each; the dates on them are the evidence if a review is late.
A transmittal is a cover document sent with drawings, submittals or other project documents that lists what is enclosed, who it is from and to, the date, and why it is being sent: for approval, for review, for information or for the record. It gives both sides a dated record of exactly what changed hands.
What goes on a transmittal
Federal specifications make the form part of the procedure. UFGS 01 33 00 §1.6.1 says to send each submittal to the approving office "using the transmittal form prescribed by the Contracting Officer" (on Army jobs, ENG Form 4025-R), with "all information prescribed by the transmittal form", and to take "special care" listing the specification paragraph and drawing sheet for each item. The register's transmittal numbers are "consecutive, Contractor-assigned numbers". The City of Los Angeles Bureau of Engineering's shop drawing procedure starts the same way: the contractor completes its "Submittal Transmittal Form" and sends the package.
| Field | Example |
|---|---|
| Transmittal number and date | T-014, November 23 |
| From and to | GC project manager to the architect |
| Items enclosed | Submittal 003 Rev 0, panelboard shop drawings, 12 sheets |
| Spec section and sheets | 26 24 16; E-601 |
| Sent for | Approval, review, information, or record |
| Action needed by | December 7 |
| Copies | MEP engineer, electrical subcontractor |
Transmittal vs submittal
The submittal is the content: the shop drawings, cut sheets or samples being reviewed. The transmittal is the envelope that says what is inside and what the sender wants done with it. On a made-up job, the GC sends transmittal T-014 to the architect enclosing submittal 003 for approval; when the architect returns the reviewed drawings, its own transmittal records the date and the review code. The review code goes on the submittal, not on the transmittal.
Transmittals also cover documents that aren't submittals: a revised drawing set to the subs, closeout binders to the owner. The Los Angeles bureau's document control procedure logs each record's number, date received and date returned. Those dates are what show who was holding what if a delay is disputed later. To see how subs put the package together, read how to prepare a submittal; to track them all, use a submittal log.
The bottom line
A transmittal is the dated cover sheet that says what was sent, to whom and why. Use the form your specs name, number them in sequence and keep every copy.
Conflo has no separate transmittal form today: each submittal in its Submittals tool carries its own number, spec section, files and dates.
Sources
- UFGS 01 33 00 Submittal Procedures (August 2026), §1.6.1 and §1.9.4 — Whole Building Design Guide, USACE / NAVFAC / AFCEC. Read October 16, 2026.
- Project Delivery Manual, 16.1 Shop Drawings — City of Los Angeles, Bureau of Engineering. Read October 16, 2026.
- Project Delivery Manual, 16.5 Construction Document Control — City of Los Angeles, Bureau of Engineering. Read October 16, 2026.
Questions
Is a transmittal required for every submittal?
Often, yes. Many specifications require each submittal to travel with a transmittal on a named form, and some software produces one for each submittal. Check Division 01 of your specifications.
What is the difference between a transmittal and a letter?
A letter says something; a transmittal lists what is enclosed and what the sender wants done with it. A transmittal can carry a short remark, but anything that needs an answer about the documents belongs in an RFI.
Related
Definition
What Is a Submittal in Construction?
A submittal is what the contractor sends the design team to show how it will meet the specs: shop drawings, product data, samples. Types and an example.
· 4 min read
Construction
How Does a Subcontractor Prepare a Submittal?
How a subcontractor prepares a submittal the GC and architect can approve the first time: what to include, how to mark it up, deviations, and resubmittals.
· 9 min read
Template
Free Submittal Log Template (Excel)
A free submittal log template in Excel, no email needed: one row per spec item, with approve-by and submit-by dates worked out from lead times.
· 4 min read
Closeout
How Do You Assemble a Construction Closeout Package?
A closeout checklist by spec section and company: O&M manuals, as-builts, warranties, attic stock, training, lien waivers. Build it at buyout. Example.
· 9 min read
Role hub
The General Contractor's Guide: Bid to Closeout
What a general contractor is responsible for at every phase of a commercial job, from bidding and buyout to RFIs, change orders, pay apps and closeout.
· 8 min read