Construction drawing management software

Always build from the current sheet.

Drawings keeps the project's sheet log in one place. Issue a set or an ASI, and every sheet number that already exists moves to its next revision while the old one is marked superseded. The field sees the current set by default; the full history is one click away.

Live demo — click any tool in the sidebar.

Inbox 4Projects
JR

Drawings

The current set, sheet by sheet, with every revision and bulletin on file.

Search…
All 214Architectural 86Structural 34MEP 94
SheetTitleRev
A-103Level 3 floor planHollis + Park Architects4
A-521Storefront and canopy detailsHollis + Park Architects2
S-501Column base plate detailsKeane Structural3
M-401Roof mechanical planTidewater MEP Engineers2
E-201Level 1 lighting planTidewater MEP Engineers0

What it does

The current set, sheet by sheet, with every revision kept.

Automatic revisions

Issue a sheet number that already exists and it gets the next revision number. The previous revision is marked superseded, never deleted.

Sets and issues

Group sheets into named sets such as the construction set, ASI-03 or Bulletin 2, each with an issue date and a note on what changed.

Organized by discipline

General, civil, landscape, architectural, structural, mechanical, plumbing and electrical tabs with counts. The sheet prefix picks the discipline for you.

Current or full history

The log shows current sheets by default. Switch to all revisions, or filter to a single set to see exactly what that issue contained.

Superseded-sheet warning

Opening an old revision shows a clear warning not to build from it, with a link straight to the current revision.

Sheet history and linked RFIs

Each sheet shows its discipline, set, revision date and who issued it, the list of every revision, and the RFIs that reference it.

How it works

Step by step.

From the first step to the final record.

  1. Step 1

    Name the issue

    Start a new set, such as ASI-03, or add sheets to an existing one. Set the issue date and describe what changed.

  2. Step 2

    List the sheets

    Enter each sheet number and title. Conflo checks the number format, rejects duplicates and shows whether each sheet is new or a revision.

  3. Step 3

    Issue

    New sheets start at revision 0. Existing sheets move up one revision, and the prior revision is kept as superseded.

  4. Step 4

    Work from the current set

    Everyone on the project browses the log by discipline, searches by number or title, and opens any sheet's revision history.

Questions

Drawings, answered.

What happens to the old revision when a sheet is reissued?

It stays on record, marked superseded. You can open it from the sheet's revision list, and it carries a warning pointing to the current revision.

Who can issue drawings?

The general contractor and the design team. Subcontractors and the owner can view every sheet and its history.

Can I see only what was in one ASI or bulletin?

Yes. Filter the log by set to see exactly the sheets that issue contained, whether they are still current or not.

How are sheets organized?

By discipline, then by sheet number. The prefix of the sheet number, such as A for architectural or S for structural, sets the discipline.

Drawings and every other tool — free for your first project.