Submittal software for construction

Submittals reviewed in order, with every revision kept

Each submittal moves from the sub to GC review, then design review and an optional consultant review, with standard review codes at every step. Revisions stay linked under one number, and required-on-site dates show which approvals are running late.

Live demo — click any tool in the sidebar.

Inbox 4Projects
JR

Submittals

Shop drawings, product data and samples through review, with lead times attached.

Search…
All 61In review 14Overdue 3Revise & resubmit 5Approved 42
#SubmittalStatusDue
SUB-041Aluminum storefront shop drawings08 43 13 · Clearview GlazingOverdueOct 3
SUB-044Rooftop units RTU-1 thru RTU-423 74 13 · Summit MechanicalIn reviewOct 15
SUB-046Door hardware schedule08 71 00 · Crestline Doors & HardwareIn reviewOct 17
SUB-038Firestopping systems07 84 00 · Redline FirestopRevise & resubmitOct 10
SUB-035Switchgear and panelboards26 24 13 · Brightline ElectricApproved as notedSep 26
SUB-032Rebar shop drawings — Level 2 deck03 21 00 · Apex ConcreteApprovedSep 19

What it does

Sequential review, fixed review codes and every revision kept.

Sequential review steps

GC review, design review and consultant review run in order. The next step opens only when every required reviewer on the current one has responded.

Standard review codes

Reviewers respond with approved, approved as noted, revise and resubmit, or rejected. Anything other than approved needs a note saying what to change.

Revisions under one number

A revise-and-resubmit starts the next revision as a draft for the sub. Rev 0, Rev 1 and on stay linked on the submittal, with the latest one in the log.

At-risk by required-on-site date

Enter when the material is needed on site and its lead time. Conflo works out the approve-by date and flags submittals that are at risk of missing it.

Ball-in-court by company

The log shows which company holds each submittal and the active review step, from the sub preparing it to the reviewer on it now.

Organized by spec section and package

Record the spec section, submittal type (shop drawings, product data, samples, calculations, mockups, certificates, O&M manuals), package and location.

How it works

Step by step.

From the first step to the final record.

  1. Step 1

    Set up the submittal

    Enter the title, spec section, type and the sub who prepares it. Add the package, location, required-on-site date and lead time.

  2. Step 2

    Pick the reviewers

    Choose GC, design and consultant reviewers. Only the people you pick review it; if no GC reviewer is picked, the GC step is skipped.

  3. Step 3

    Submit for review

    The sub or the GC submits it. Each step's reviewers see it in their Inbox and respond with a review code and notes.

  4. Step 4

    Return it to the sub

    The GC returns it with the final code, and the deciding review is marked official. A revise and resubmit goes back to the sub to start the next revision.

Questions

Submittals, answered.

What review codes are available?

Approved, approved as noted, revise and resubmit, and rejected. A revise and resubmit or rejection at any step ends that round and sends the submittal back to the GC.

How are resubmittals handled?

When a submittal is returned as revise and resubmit, the sub or GC starts the next revision. It keeps the same number and reviewers, and earlier revisions stay listed on the submittal.

Can subs see other companies' submittals?

No. A subcontractor sees only their own company's submittals. The GC, owner and design team see the full log.

How does Conflo decide a submittal is at risk?

It subtracts the lead time from the required-on-site date to get an approve-by date. Submittals without approval within seven days of that date are flagged.

Submittals and every other tool — free for your first project.